MFA 209 Project Management Notes for GGSIPU MBA (FA) Sem 3

Programme
Master of Business Administration

MFA-209 Project Management Notes by Unnati Educations cover all 4 units of this GGSIPU MBA (Financial Analysis) Semester 3 elective in a 67-page printed book: 20 solved illustrations, 38 figures, 3 case studies and 72 exam questions, mapped to the MBA (FA) scheme that applies from the 2021-22 session onwards.

Written by Prateek Talwar, Founder, Unnati Educations (ACS, ICSI) · Reviewed by Sheetal Kirola, M.Ed., Academic Head (academic review) · Checked against the MBA (FA) Scheme and Syllabus 2021-22 onwards (ipu.ac.in) · Updated 30 October 2026 · Editorial policy

Scheme: MBA (FA) Scheme and Syllabus 2021-22 onwards | Applies to: batches from the 2021-22 academic session | Verified against: official MBA (FA) syllabus PDF on ipu.ac.in, checked 30 October 2026

MFA-209 Project Management at a glance: GGSIPU MBA (FA) Sem 3 credits, units and exam pattern

MFA-209 is the Semester 3 elective built around CPM, PERT, crashing and earned value. Students choose four electives, and it sits with the other GGSIPU MBA (FA) Semester 3 papers.

MFA-209 snapshot from the official MBA (FA) scheme and syllabus
Code and titleMFA-209 Project Management
Course and semesterMBA (Financial Analysis), Semester 3
Category and creditsDiscipline Specific Elective · L 3, no T/P · 3 credits · 42 teaching hours (10, 12, 10, 10 by unit)
Marks100: 50 internal (two class tests of 15 each + 20 for assignments, viva and participation) + 50 end-term
End-term patternWritten University exam of 50 marks; question-wise paper-setter instructions are not printed in the official PDF
Applies toMBA (FA) scheme w.e.f. the 2021-22 academic session
Units4: Project Identification and Selection · Project Planning and Resource Consideration · Organizational Structure and Quality Issues · Project Risk Management, Performance Management and Control
Paired labNone (MFA-227 Finance Lab-I is a separate NUES paper)
View complete table: MFA-209 snapshot from the official MBA (FA) scheme and syllabus

This view preserves the original alignment. Scroll within it if needed to read the complete content.

MFA-209 snapshot from the official MBA (FA) scheme and syllabus
Code and titleMFA-209 Project Management
Course and semesterMBA (Financial Analysis), Semester 3
Category and creditsDiscipline Specific Elective · L 3, no T/P · 3 credits · 42 teaching hours (10, 12, 10, 10 by unit)
Marks100: 50 internal (two class tests of 15 each + 20 for assignments, viva and participation) + 50 end-term
End-term patternWritten University exam of 50 marks; question-wise paper-setter instructions are not printed in the official PDF
Applies toMBA (FA) scheme w.e.f. the 2021-22 academic session
Units4: Project Identification and Selection · Project Planning and Resource Consideration · Organizational Structure and Quality Issues · Project Risk Management, Performance Management and Control
Paired labNone (MFA-227 Finance Lab-I is a separate NUES paper)

MFA-209 Project Management Notes unit-wise: 20 solved illustrations, 38 figures and 72 exam questions across 4 units

These MFA-209 Project Management IPU notes follow one ₹80 lakh, 60,000-unit plant: appraised in Unit 1, costed in Unit 2, tracked with EVM in Unit 4. Other papers are on the GGSIPU MBA (FA) notes page; the sample PDF sits at the top.

MFA-209 Unit 1: Project Identification and Selection

Pages 5 to 20. It walks the idea-to-selection path: sourcing and screening ideas with a rating index, environment scanning, the project charter, pre-feasibility, the four feasibility tests (financial with NPV, IRR and DSCR; economic with UNIDO and L-M) and project break-even. 8 sections, 5 illustrations, 8 figures, an EV-charging case, 18 exam questions.

Quick look: pre-feasibility vs feasibility study (from page 13)
BasisPre-feasibilityFeasibility
PurposeIs a detailed study worthwhile?Should we invest?
DataMostly secondaryPrimary + secondary
Cost estimate accuracyAbout ±20% to ±30%About ±10%
OutputGo / no-go for detailed studyDetailed Project Report for investment and loan

Quick look: pre-feasibility vs feasibility study (from page 13)

Basis
Purpose
Pre-feasibility
Is a detailed study worthwhile?
Feasibility
Should we invest?
Basis
Data
Pre-feasibility
Mostly secondary
Feasibility
Primary + secondary
Basis
Cost estimate accuracy
Pre-feasibility
About ±20% to ±30%
Feasibility
About ±10%
Basis
Output
Pre-feasibility
Go / no-go for detailed study
Feasibility
Detailed Project Report for investment and loan

MFA-209 Unit 2: Project Planning and Resource Consideration

Pages 21 to 36, the most numerical unit. Life cycle, RACI, Tuckman's team stages, WBS, resource levelling, cost of project with the six-tenths rule, then CPM, floats, PERT, crashing and updating. 9 sections, 7 illustrations, 11 figures, a Delhi Metro case, 18 exam questions.

Quick look: chance of finishing a PERT project in 25 days (from page 31)

  1. Critical path A-C-E-G gives Te = 22 days.
  2. Add variances of critical activities: 0.444 + 1.000 + 4.000 + 0.111 = 5.556.
  3. σp = √5.556 = 2.357 days.
  4. Z = (25 − 22) ÷ 2.357 = 1.27, so the probability is 89.80%.

MFA-209 Unit 3: Organizational Structure and Quality Issues

Pages 37 to 51, the people-and-quality unit: the project leader, project vs line manager, leadership styles, Thomas-Kilmann conflict modes, team and diversity management, Lewin's change model, seven quality tools, cost of quality and value engineering. 9 sections, 3 illustrations, 10 figures, 18 exam questions.

Quick look: value index of a distribution box, cost vs worth in ₹ (from page 49)
ComponentCostWorthValue index
Enclosure1,8001,5000.83
Door lock4501500.33
Busbar1,2001,1000.92
Nameplate and finish3501200.34

Quick look: value index of a distribution box, cost vs worth in ₹ (from page 49)

Component
Enclosure
Cost
1,800
Worth
1,500
Value index
0.83
Component
Door lock
Cost
450
Worth
150
Value index
0.33
Component
Busbar
Cost
1,200
Worth
1,100
Value index
0.92
Component
Nameplate and finish
Cost
350
Worth
120
Value index
0.34

MFA-209 Unit 4: Project Risk Management, Performance Management and Control

Pages 52 to 66: risk types, the PMBOK risk process, risk register, probability-impact matrix, EMV, sensitivity and scenario analysis, risk responses, earned value, the Keegan matrix, productivity, post-project audit and the control cycle. 10 sections, 5 illustrations, 9 figures, a MoSPI overruns case, 18 exam questions.

Quick look: earned value at month 6, BAC ₹80 lakh (from page 60)
MeasureWorkingReading
SV40 − 48 = −8Behind schedule
CV40 − 44 = −4Over budget
SPI / CPI0.83 / 0.9191 paise of work per rupee
EAC / TCPI₹88 lakh / 1.11Needs 11% more efficiency

Quick look: earned value at month 6, BAC ₹80 lakh (from page 60)

Measure
SV
Working
40 − 48 = −8
Reading
Behind schedule
Measure
CV
Working
40 − 44 = −4
Reading
Over budget
Measure
SPI / CPI
Working
0.83 / 0.91
Reading
91 paise of work per rupee
Measure
EAC / TCPI
Working
₹88 lakh / 1.11
Reading
Needs 11% more efficiency

MFA-209 exam corner: 40 two-and-a-half-mark and 32 twelve-and-a-half-mark questions by unit

Each unit ends with 10 short questions labelled "2.5 Marks" and 8 long ones labelled "12.5 Marks". The official PDF prints no question-wise pattern, so these labels are the notes' own practice format.

MFA-209 exam questions and solved illustrations by unit
UnitShort (2.5 Marks)Long (12.5 Marks)Illustrations
11085
21087
31083
41085

MFA-209 exam questions and solved illustrations by unit

Unit
1
Short (2.5 Marks)
10
Long (12.5 Marks)
8
Illustrations
5
Unit
2
Short (2.5 Marks)
10
Long (12.5 Marks)
8
Illustrations
7
Unit
3
Short (2.5 Marks)
10
Long (12.5 Marks)
8
Illustrations
3
Unit
4
Short (2.5 Marks)
10
Long (12.5 Marks)
8
Illustrations
5
  • Unit 1: Fixed cost ₹96 lakh, price ₹800, variable cost ₹480, capacity 60,000 units: find BEP. Pointer: contribution ₹320, so BEP = 30,000 units, 50% of capacity.
  • Unit 2: What is cost slope? Pointer: (crash cost − normal cost) ÷ (normal time − crash time); activity B gives 3,000 ÷ 2 = ₹1,500 a day.
  • Unit 3: Name the five conflict-handling modes. Pointer: collaborating, compromising, accommodating, competing, avoiding; collaborating is the long-term win-win.
  • Unit 4: Define SPI and CPI. Pointer: SPI = EV ÷ PV and CPI = EV ÷ AC; below 1 means behind schedule or over budget.

The MFA-209 notes set 40 short-answer and 32 long-answer questions across 4 units, plus 20 solved illustrations. More practice will sit in the MFA-209 important questions.

Who writes and checks the MFA-209 Project Management notes?

  • Prateek Talwar, author · Founder, Unnati Educations · Associate Company Secretary (ACS), ICSI, membership no. 58704, since 15 May 2019 · B.Com, University of Delhi (SOL), 2012 · author profile
  • Sheetal Kirola, academic reviewer · Academic Head · M.Ed. · 7 years of experience · checks structure, clarity and syllabus order, not the CPM, PERT or financial working · reviewer profile

Mapped to the 2021-22 MBA (FA) scheme. The 2026-27 edition adds a Quick Revision table per unit and Indian cases such as Delhi Metro Phase I. Last updated 30 October 2026 under our editorial policy.

The same author-then-review check is used for the GGSIPU important questions we prepare.

How to write MFA-209 answers: CPM, PERT and crashing numericals step by step, plus comparison-table theory answers

Unit 2 and Unit 4 numericals are marked on working; Units 1 and 3 reward structured theory. The notes' exam tips set the pattern:

  • For a network, show both passes in one table, list every path with its length, then floats and the critical path as separate steps (TF ≥ FF ≥ IF).
  • Crash only critical activities, cheapest cost slope first, one day at a time; stop when extra direct cost beats the indirect cost saved.
  • For "compare" questions (functional, matrix and projectized; CPM vs PERT), answer with a table and one diagram.
  • For the control process, draw the six-step cycle and add an EVM example.

Worked example (page 29): activities A to H give three paths: A-C-F-H = 20 days, A-D-E-G-H = 21 days, B-E-G-H = 19 days. The longest, A-D-E-G-H, is critical, so the project takes 21 days. B has 2 days of total float, C and F 1 day each.

A common slip is skipping the float table. Practise this format on GGSIPU MBA (FA) important questions.

MFA-209 and the GGSIPU MBA (FA) Sem 3 papers it connects to

MFA-209 has no lab of its own; see where it sits in the two-year GGSIPU MBA (FA) syllabus.

These GGSIPU MBA (FA) Sem 3 Project Management notes connect to:

  • MFA-223 Entrepreneurial Development and Start-up Finance: Unit 1's idea screening, pre-feasibility and means of finance.
  • MFA-205 International Financial Management: Unit 4's political, exchange-rate and market risks on cross-border projects.
  • Also in Semester 3: MFA-203 Behavioral Finance, MFA-227 Finance Lab-I (NUES), MOOC/Open Elective, and electives MFA-207, 211, 213, 215, 217, 219, 221 and 225.

Looking back, Unit 1's NPV and IRR build on MFA-102 Financial Management, and Unit 2's PERT probability uses the normal distribution from MFA-103 Quantitative Techniques.

Weak, balanced and strong matrix organisations in project management: excerpt from page 38 of the MFA-209 notes

Excerpt from page 38

What a matrix organisation is

A matrix structure blends the functional and the project structure. Staff stay in their functional departments, which is the vertical line of authority, but are lent to projects run by project managers, which is the horizontal line. So each member reports to two bosses: the functional head and the project manager.

Picture a firm with engineering, purchase, finance and HR heads running three projects at once. The Plant X project borrows two engineers, a buyer, an accountant and a recruiter; Plant Y takes three engineers, a buyer and an accountant; the ERP project takes one engineer, two accountants and a trainer. Nobody leaves their department for good.

Three kinds of matrix

In a weak (functional) matrix, the project manager is little more than a coordinator, and functional managers control people and budget. In a balanced matrix, power is shared: the project manager plans and controls, while functional managers decide how the work is done. In a strong (project) matrix, a full-time project manager with own staff holds high authority, and functional heads mainly supply experts.

Merits and limits

The matrix uses scarce specialists across many projects, keeps a strong project focus with functional depth, responds quickly to clients, and lets staff return to their department after the project, so there is no job insecurity. The price is two bosses, which breaks unity of command and breeds conflict, power struggles between project and functional managers, more coordination meetings, and slower decisions wherever approval is shared.

Where it fits

Comparing the three structures, the project manager's authority rises from little or none (functional) to low-to-high (matrix) to almost total (projectized), and budget control moves from the functional manager to shared to the project manager. A functional set-up suits small in-house projects, a matrix suits many simultaneous projects that share experts, and a projectized set-up suits large, long and complex projects.

Do the MFA-209 notes cover the full GGSIPU syllabus?

Yes. Every official MFA-209 topic has a matching section, and the notes add earned value management and project closure.

MFA-209 official units mapped to the notes
Official unitOfficial topicsIn the notesStatus
I Project Identification and SelectionIdentification Process, Idea Generation and Screening, Environment Monitoring, Investment Opportunities, Initiation, Pre-Feasibility, Feasibility (Technical, Market, Financial, Economic), Break-evenSections 1-8, pp 5-18Covered
II Project Planning and Resource ConsiderationPlanning and its Need, Life Cycle, Roles and Team Work, Resources, Allocation, Scheduling, Cost Estimate and Budgets, CPM, PERT, Float, Crashing, Contraction, Updating, Cost AnalysisSections 1-9, pp 21-34Covered
III Organizational Structure and Quality IssuesOrganizational Structure, Project Leader, Manager vs Line Manager, Leadership Styles, Conflict Resolution, Team and Diversity, Change, Quality Management and Concepts, Value EngineeringSections 1-9, pp 37-50Covered
IV Risk, Performance Management and ControlTypes of Risks, Role and Steps of Risk Management, Identification, Analysis, Reducing Risks, Performance Measurement and Matrix, Productivity, Evaluation, Execution, Control ProcessSections 1-10, pp 52-65Covered

MFA-209 official units mapped to the notes

Official unit
I Project Identification and Selection
Official topics
Identification Process, Idea Generation and Screening, Environment Monitoring, Investment Opportunities, Initiation, Pre-Feasibility, Feasibility (Technical, Market, Financial, Economic), Break-even
In the notes
Sections 1-8, pp 5-18
Status
Covered
Official unit
II Project Planning and Resource Consideration
Official topics
Planning and its Need, Life Cycle, Roles and Team Work, Resources, Allocation, Scheduling, Cost Estimate and Budgets, CPM, PERT, Float, Crashing, Contraction, Updating, Cost Analysis
In the notes
Sections 1-9, pp 21-34
Status
Covered
Official unit
III Organizational Structure and Quality Issues
Official topics
Organizational Structure, Project Leader, Manager vs Line Manager, Leadership Styles, Conflict Resolution, Team and Diversity, Change, Quality Management and Concepts, Value Engineering
In the notes
Sections 1-9, pp 37-50
Status
Covered
Official unit
IV Risk, Performance Management and Control
Official topics
Types of Risks, Role and Steps of Risk Management, Identification, Analysis, Reducing Risks, Performance Measurement and Matrix, Productivity, Evaluation, Execution, Control Process
In the notes
Sections 1-10, pp 52-65
Status
Covered

Verify it yourself: MBA (Financial Analysis) Scheme and Syllabus, 2021-22 onwards. MFA-209 is on page 43, the elective list on page 7 and the marks rules on page 4.

The official Unit II title is printed as "Recourse Consideration"; the topics are about resources, so the notes use "Resource". Every course in GGSIPU notes is mapped to its official PDF this way.

MFA-209 Project Management notes FAQs

How do I get the full MFA-209 notes?

Tap "Get Full Notes" at the top or the WhatsApp button at the end and send the pre-filled message. The full MFA-209 notes come as a 67-page printed book covering all 4 units, and our team shares order details on WhatsApp. Delivery takes a maximum of 5 to 7 days; the rest depends on your location. Check the sample PDF first to see the layout.

Are the MFA-209 notes available as a PDF?

No. The full MFA-209 notes are sold only as a printed book. The only PDF here is the watermarked sample with the cover, index and one page from each unit, so you can see the network diagrams, formula boxes and solved illustrations before ordering. Orders are taken on WhatsApp and delivered within 5 to 7 days, depending on location.

How is MFA-209 marked, and what is the passing mark?

MFA-209 is marked out of 100: 50 internal and 50 end-term. The internal 50 is two class tests of 15 marks each plus 20 marks for assignments, presentations, viva-voce and participation. The MBA (FA) scheme PDF does not state a pass percentage, so we do not quote one. For end-term minimums and re-appear rules, check GGSIPU Ordinance 11 on ipu.ac.in.

Is MFA-209 compulsory in MBA (FA) Semester 3?

No. MFA-209 is one of ten Discipline Specific Electives, MFA-207 to MFA-225, and each student picks four of them in Semester 3. It carries 3 credits like the other electives. Choose it if you want the CPM, PERT, crashing and earned value tools used in infrastructure, consulting and project finance roles; it pairs well with MFA-223 on start-up finance.

Which MFA-209 unit has the most numericals?

Unit 2 has 7 of the book's 20 solved illustrations: resource levelling, cost of project and means of finance, CPM with floats, PERT probability, crashing for minimum cost, updating at day 10 and the idle-cost saving from levelling. Unit 1 and Unit 4 add 5 each, on NPV, break-even, EMV, sensitivity and earned value, and Unit 3 has 3.

Are the 72 MFA-209 exam questions solved one by one?

No, and we want to be clear about it. The 40 short-answer and 32 long-answer questions at the end of each unit are a practice list; the material to answer them sits in that unit's sections, figures and Quick Revision table. The 20 illustrations are fully solved, and this page answers four of the questions in the exam corner above.

Get the full MFA-209 Project Management Notes on WhatsApp

The full Project Management notes in English come as a 67-page printed book (not a PDF) with 20 solved illustrations, 38 figures, 3 cases and 4 Quick Revision tables.

MFA-209 printed book pages by unit
UnitPagesExam questions
1 Identification and Selection5-20 (16)18
2 Planning and Resources21-36 (16)18
3 Structure and Quality37-51 (15)18
4 Risk, Performance and Control52-66 (15)18

MFA-209 printed book pages by unit

Unit
1 Identification and Selection
Pages
5-20 (16)
Exam questions
18
Unit
2 Planning and Resources
Pages
21-36 (16)
Exam questions
18
Unit
3 Structure and Quality
Pages
37-51 (15)
Exam questions
18
Unit
4 Risk, Performance and Control
Pages
52-66 (15)
Exam questions
18

Delivery: maximum 5 to 7 days after your order is confirmed; the rest depends on your location.

Order the full MFA-209 notes book on WhatsApp (4 units, 67 pages)

Unnati Educations is an independent education provider based in Vikaspuri, Delhi. We are not affiliated with, authorised by, or endorsed by Guru Gobind Singh Indraprastha University (GGSIPU). 'GGSIPU' and 'IPU' are used only to describe the syllabus our notes follow. For official information, visit ipu.ac.in.

Ready for the full notes?

Discuss coverage and delivery with our team.