Home IGNOU Admission Guess Paper Previous Year Paper Solved Assignment Blog
ONR 001 Solved Guess Paper 2026 for Introduction to Water Harvesting (IGNOU Certificate in Water Harvesting and Management, CWHM)
Session 2026 Verified Digital
Available Now

ONR 001 Solved Guess Paper 2026 for Introduction to Water Harvesting (IGNOU Certificate in Water Harvesting and Management, CWHM)

Our Price

₹299.00 ₹399.00
25% OFF

Language

English

Session

2026

Delivery

PDF

Updated

Oct 2026

Value Highlights

ONR 001 Solved Guess Paper with 19 exam-ready answers, mapped block-wise to Block 1 and Block 2 of your IGNOU study material.
Built from six real papers, December 2023 to June 2026, so every HIGH tag reflects how often a topic actually came back.
Neat, labelled diagrams you can copy by hand: institutional block diagram, watershed concept and the fresh water pie charts.
Each answer opens with the book definition, then short headed points, which is the exact format examiners scan for marks.
Key numbers in one place: 1700 m³ stress, 1000 m³ scarcity, 135% irrigation intensity and 35-40% irrigation efficiency.
Word targets for every answer: about 250 words for 10 marks, 150 for 5 marks and 75 for each 2.5-mark short note.
Full forms of NRAA, SLNA, DWDU, PIA, WDT and NWDPRA explained, so the role-and-functions question never trips you up.
Simple English that non-science learners follow easily, plus a what-not-to-prepare list that saves real revision time.

Course Overview

ONR 001 at a glance

  • Course code and name: ONR-001, Introduction to Water Harvesting
  • Programme: Certificate in Water Harvesting and Management (CWHM)
  • Syllabus: 2 blocks, 4 units: Block 1 Basic Concepts, Block 2 Watershed Management
  • Exam format: 2 hours, 50 marks, 8 questions set, attempt any 5, each worth 10 marks
  • Guess paper size: 19 questions with answers, 21 pages
  • Shown on this page: 5 full sample answers (14 more in the complete file)
  • Papers analysed: 6 sessions, December 2023 to June 2026
  • Target exam: December 2026 term-end examination

The ONR 001 Solved Guess Paper gives you 19 solved questions covering all four units of Introduction to Water Harvesting, with diagrams, word targets and a six-session frequency grid.

1. What You Get in the ONR 001 Solved Guess Paper

Most ONR 001 learners are not from a science or agriculture background. Many are working people, teachers or panchayat staff who joined CWHM out of real interest in water. The book is packed with figures, acronyms and scheme names, and that is where marks slip away. This guess paper turns that material into answers you can actually write in the exam.

Every answer follows the same exam-tested flow:

  1. It opens with the book definition.
  2. It then gives four to eight headed points.
  3. A diagram follows wherever the question asks for one.
  4. It closes with a two-line conclusion.

Each question also carries a priority tag (HIGH, MEDIUM or LOW), the block and unit it comes from, and the sessions in which it last appeared. If you are preparing more than one course this term, our full range of IGNOU Solved Guess Paper titles follows the same format.

The file ends with three short rule boxes: the exam pattern, what not to prepare, and what examiners want to see. The "what not to prepare" box alone can save you a day. For example, it tells you to learn only the main heads of the long village survey format, not every line of it.

2. Five Solved Sample Questions from ONR 001

These five answers are copied from the paid file without edits, so you can check the language, depth and diagrams before you order. They come from four different units, so together they show how the whole file reads.

Sample 1 of 5File Q1Block 2, Unit 410 marksHIGH priority, asked in 4 of 6 papers

Institutional arrangement for watershed projects

Question: Explain the institutional arrangement for effective implementation of watershed projects in the country with the help of a neat block diagram.

Institutional arrangements at central, state, district, village and project level agencies including Panchayati Raj Institutions (PRIs) are of paramount importance for effective management of watershed development projects.

The set-up works at the national, state, district and village levels. The full file carries a block diagram of the chain from NRAA down to the WDT.

National Rainfed Area Authority (NRAA)

  1. It is the nodal agency (main coordinating body) at the central level.
  2. It helps in budget allocation and the smooth flow of funds to the DWDUs.
  3. It links the different ministries doing watershed work.

State Level Nodal Agency (SLNA)

  1. It oversees all watershed projects in the state.
  2. It prepares perspective and strategic (long-term) plans.
  3. It sets up monitoring and evaluation.

District Watershed Development Unit (DWDU)

  1. It oversees watershed projects in each district, with separate accounts.
  2. It works with the District Planning Committee.
  3. It identifies the Project Implementing Agencies.

Panchayati Raj Institutions (PRIs)

  1. The Zilla Parishad coordinates schemes, reviews progress and settles disputes.
  2. Intermediate Panchayats help in planning and give technical guidance.

Project Implementation Agency (PIA) and Watershed Development Team (WDT)

  1. The PIA includes line departments, research bodies, Intermediate Panchayats and Voluntary Organisations.
  2. It guides the Gram Panchayat in making the watershed plan.
  3. Each PIA is supported by a WDT of at least four experts, and at least one member must be a woman.

Conclusion: Each level supports the level below it. Funds move down and documents move up, and this chain is what makes watershed projects succeed.

Sample 2 of 5File Q6Block 2, Unit 35 + 5 marksHIGH priority, asked in 4 of 6 papers

The watershed concept and its components

Question: (a) Define watershed. Describe the concept of watershed with the help of a diagram. (b) What are the different components of watershed management? Explain with a flow diagram.

(a) The watershed concept

Watershed is entire geographic unit of particular land from where rainwater as run off is drained out from ridges along the slopes of land to single particular point outlet or common drain point.

The full file carries a diagram showing the ridge line, drainage lines and single outlet.

  1. Ideal planning unit: It is the best unit for conserving soil, water and biodiversity.
  2. Ridge to outlet: It covers all land from the ridge line to the outlet of the nala, not just farm land.
  3. Single window approach: All problems of the area are handled in one place.
  4. Ongoing process: Plans are revised when new challenges arise.

(b) Components of watershed management

The watershed management is rational utilization and conservation of land, water and biodiversity of natural resources without further deterioration of environment.
  1. Soil and water conservation: Proper land use and protecting land from damage.
  2. Water harvesting: Conserving water for farm use.
  3. Improving productivity: Maintaining soil fertility and raising crop yield.
  4. Drainage and flood control: Proper water management for drainage and flood protection.

People's participation, from planning to implementation, runs through all four components.

Sample 3 of 5File Q11Block 1, Unit 25 + 5 marksHIGH priority, asked in 4 of 6 papers

Dark areas and ITK water harvesting structures

Question: (a) Define 'dark area' with respect to groundwater extraction. List the states where groundwater depletion is alarming. How does rainwater harvesting help recharge aquifers? (b) What does ITK stand for? Explain any four water harvesting structures used in India.

(a) Dark areas and groundwater depletion

The areas where groundwater development is more than 90% (the ratio of groundwater withdrawal and recharge is more than 0.9) are categorized as 'dark' areas.
  1. Meaning: No further groundwater development should be done, because recharge is far below withdrawal.
  2. Alarming states: Rajasthan, Gujarat, Tamil Nadu, Punjab, Delhi and Haryana.
  3. Scale: About 60% of blocks in Punjab and 40% in Haryana have turned dark.
  4. Causes: Many private tube wells, the water-hungry wheat-paddy rotation, and free electricity for farm pumps in Punjab.
  5. Role of rainwater harvesting: Runoff is diverted to recharge aquifers, dug wells store monsoon water, and roof water harvesting recharges aquifers in cities.

(b) ITK structures

ITK stands for Indigenous Traditional Knowledge.

ITK is based on common sense and wisdom of local people of area.
  1. Tanka: An underground, kund-type structure in the Rajasthan desert that stores rainwater for drinking by people and livestock.
  2. Khadin (dhora): A 100-300 m earthen embankment in Jaisalmer that harvests runoff for farming.
  3. Johad: A small earthen check dam in Rajasthan that improves groundwater recharge.
  4. Kund or Kundi: A well in the Thar Desert fed by a saucer-shaped catchment, used for drinking water.
  5. Bandhara: A check dam across rivers in Maharashtra that irrigates sugarcane and controls floods.
Sample 4 of 5File Q13Block 1, Unit 15 + 5 marksHIGH priority, asked in 4 of 6 papers

Water stress and water scarcity

Question: (a) Define water stress and water scarcity. What are the causes, effects and solutions of water scarcity? (b) Why is water scarcity a concern in urban areas? Explain the water problems in the extreme arid conditions of India.

(a) Definitions, causes and solutions

Water Scarcity: When per capita annual water availability is less than 1000 m³, it is considered to be condition of water scarcity. Water Stress: When per capita annual water availability is around 1700 m³, it is considered to be condition of water stress.

The full file carries a bar chart of per capita water availability in India from 1951 to 2050.

  1. Causes: Growing population, uneven rainfall, groundwater overexploitation and polluted rivers.
  2. Effects: It can hurt economic development and human health, and it leads to water disputes.
  3. Solutions: Rainwater harvesting, recycling and re-use, minor irrigation and pollution control.

(b) Urban areas and extreme arid conditions

Urban areas:

  1. Migration from villages keeps pushing demand up.
  2. Almost all big cities lack enough potable water.
  3. Rivers, lakes and ponds are polluted and unfit for use.

Extreme arid conditions:

  1. In Jaisalmer and Bikaner, even drinking water is not available.
  2. Nomadic people move to Haryana and Punjab with their livestock in summer.
  3. In Bhiwani, women fetched water from 4-5 km away before lift irrigation came.
  4. Rainfall is only 150-500 mm, falling in 3-5 storms, and evapo-transpiration is very high.
Sample 5 of 5File Q17Block 1, Unit 15 + 5 marksHIGH priority, asked in 4 of 6 papers

Water pollution and its treatment

Question: (a) What are the types and causes of water pollution? (b) Explain in detail the process of treatment of water pollution.

(a) Types and causes

Water Pollution: Water contaminated due to impurities and chemical rendering it unfit for use.

Surface water pollution:

  1. Pollutants may be physical, chemical or biological. Suspended material is a physical pollutant.
  2. Rivers receive human, animal and untreated industrial waste. Paper, food, tanning and metal units add more.
  3. Nitrates and phosphates spoil lakes and tanks, and ammonia harms fish.

Sub-surface water pollution:

  1. Fertilisers, pesticides and weedicides leach down with water.
  2. Industrial effluents and sewage reduce dissolved oxygen.
  3. Excess arsenic, fluoride and iron make water unfit to drink.
  4. Detergents cause foam, and organic waste causes algae and clogging.

(b) Five stages of treatment

  1. Preliminary treatment: Grinders chop rags, bar screens catch large particles and grit channels remove gravel.
  2. Primary settling basin: Organic matter settles, light matter is skimmed off and a scraper collects the sludge.
  3. Secondary treatment: Air is supplied so that micro-organisms can break down the waste.
  4. Removal of N and P: Bacteria change nitrogen to nitrate, and phosphorus is removed with ferric chloride or aluminium sulphate.
  5. Disinfection: Chlorine or ozone kills pathogens, and sodium sulphite reduces chlorine toxicity.

The full file carries a flow chart of all five stages.

Liked these answers? The other 14 are written the same way.

3. All 19 Questions Inside the ONR 001 File

The file holds 19 questions in total: 5 are solved above and the other 14 come with full answers in the paid PDF. The table below is the complete list, so you know exactly what you are buying.

All 19 IGNOU ONR 001 important questions in the solved guess paper, with marks, unit and priority
No.TopicMarksBlock and unitPriority
Q1Institutional arrangement with block diagram (Sample 1)10Block 2, Unit 4HIGH
Q2Roles of NRAA, SLNA, DWDU, PRIs, PIA and WDT4 × 2.5Block 2, Unit 4HIGH
Q3Benchmark survey and natural resource survey data10Block 2, Unit 4HIGH
Q4People's participation, bottom-up approach, planning points5 + 5Block 2, Unit 4MEDIUM
Q5Participatory Rural Appraisal: principles and 12 key elements5 + 5Block 2, Unit 4HIGH
Q6Watershed concept and components (Sample 2)5 + 5Block 2, Unit 3HIGH
Q7POWER objectives and challenges of Indian agriculture5 + 5Block 2, Unit 3MEDIUM
Q8Integrated watershed management, mixed farming, multipurpose trees5 + 5Block 2, Unit 4MEDIUM
Q9NWDPRA, DPAP, HADP, WGDP and NABARD's Watershed Development Fund5 + 5Block 2, Unit 3MEDIUM
Q10State-wise legislative measures for rainwater harvesting10Block 1, Unit 2HIGH
Q11Dark area and ITK structures (Sample 3)5 + 5Block 1, Unit 2HIGH
Q12Need, principle and 10 advantages of rainwater harvesting5 + 5Block 1, Unit 2HIGH
Q13Water scarcity and water stress (Sample 4)5 + 5Block 1, Unit 1HIGH
Q14Ancient rainwater harvesting and history of irrigation5 + 5Block 1, Units 1 and 2MEDIUM
Q15Groundwater and tanks in irrigation; sector-wise water demand to 20505 + 5Block 1, Unit 1HIGH
Q16Fresh water sources pie diagram; irrigation intensity and efficiency5 + 5Block 1, Unit 1MEDIUM
Q17Water pollution and its treatment (Sample 5)5 + 5Block 1, Unit 1HIGH
Q18Short notes: Venn diagram, rainfed farming, aquifer, water potential, drought, biodiversity4 × 2.5Blocks 1 and 2HIGH
Q19Short notes: silvi-pasture, agro-forestry, sericulture, lift irrigation, user groups, ITK4 × 2.5Blocks 1 and 2MEDIUM

4. ONR 001 Syllabus: Blocks and Units

ONR 001 has two blocks and four units: Block 1 covers basic concepts of water and harvesting, and Block 2 covers watershed management. Block 2 alone accounts for most of the high-scoring 10-mark questions, which is why the file gives it more depth.

ONR 001 Introduction to Water Harvesting syllabus mapped to the questions in this guess paper
BlockUnitCore themes in the unitQuestions in the file
Block 1: Basic ConceptsUnit 1Per capita water availability, groundwater and tank irrigation, irrigation efficiency, surface and sub-surface pollutionQ13 (Sample 4), Q15, Q16, Q17 (Sample 5)
Block 1: Basic ConceptsUnit 2Principle and advantages of rainwater harvesting, dark areas, ITK structures, state building bye-lawsQ10, Q11 (Sample 3), Q12, Q14
Block 2: Watershed ManagementUnit 3Ridge-to-outlet concept, POWER goals, shrinking land and water per person, NWDPRA and DPAPQ6 (Sample 2), Q7, Q9
Block 2: Watershed ManagementUnit 4NRAA-to-WDT chain, benchmark survey, PRA, bottom-up planning, mixed farmingQ1 (Sample 1) to Q5, Q8

The guess paper is a revision tool, not a replacement for the book. If you have not opened your blocks yet, read them alongside our ONR 001 Study Material first. Then use the solved answers to see how that content turns into marks.

5. ONR 001 Exam Pattern and Topic Frequency

The ONR 001 term-end paper is 2 hours long and carries 50 marks: 8 questions are set and you attempt any 5, each worth 10 marks.

You can confirm this pattern on the official IGNOU December 2023 ONR-001 question paper. In that paper the legislative measures question appeared as a full 10-marker, the institutional arrangement question asked for a schematic diagram, and the last question was four short notes at 2.5 marks each.

How often key ONR 001 topics appeared in six IGNOU term-end papers, December 2023 to June 2026
TopicDec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jun 2026Priority
Benchmark and natural resource survey—YesYesYesYesYesHIGH
Roles of NRAA, SLNA, DWDU, PRIs, PIA, WDTYesYesYes—YesYesHIGH
Institutional arrangement (block diagram)Yes——YesYesYesHIGH
Water scarcity and stressYes—Yes—YesYesHIGH
Water pollution: types and treatment—YesYes—YesYesHIGH
Dark area and groundwater depletionYesYes—Yes—YesHIGH
Watershed concept and diagramYesYesYesYes——HIGH
Legislative measures by statesYes—Yes—Yes—HIGH
Objectives using POWER———YesYes—MEDIUM
Sources of fresh water (pie diagram)———Yes——LOW

In the file, HIGH means a topic was repeated four or more times, or it is due after a recent gap. MEDIUM means it appeared two or three times. LOW means it appeared once.

The full grid in the PDF tracks 28 topics. For older sessions, our IGNOU Previous Year Question Paper section is the best place to practise under a timer.

6. Practical File Index for CWHM Learners

ONR 001 is a theory course with no practical exam of its own, but several book topics make excellent practical-file entries for CWHM coursework.

If your study centre asks for a practical or project record, the entries below draw directly on ONR 001 content. Always follow the exact list your study centre gives you.

Suggested practical file index built on ONR 001 Introduction to Water Harvesting topics
No.Practical entryWhat you recordLinked unit
1Benchmark survey sheet of a villageLand use, soil texture, water table, rainfall by season, livestock and literacyBlock 2, Unit 4
2PRA exercise recordMeeting checklist, village resource map and a Venn diagram of local institutionsBlock 2, Unit 4
3Watershed delineation sketchRidge line, drainage lines and single outlet of a local nalaBlock 2, Unit 3
4Rooftop harvesting bye-law checkYour building's roof or plot area against your state's mandatory limitBlock 1, Unit 2
5ITK structures chartTanka, khadin, johad, kund and bandhara with region and useBlock 1, Unit 2
6Per capita water trend chartAvailability in 1951, 2001, 2025 and 2050 against stress and scarcity linesBlock 1, Unit 1
7Water treatment flow chartFive stages from preliminary screening to disinfectionBlock 1, Unit 1
8Multipurpose tree recordBabul, neem, shisham and khejri with botanical names and usesBlock 2, Unit 4

If you are also collecting files for other courses of the IGNOU Certificate in Water Harvesting and Management (CWHM), our CWHM guess Paper collection keeps them in one place.

7. How to Use the ONR 001 Solved Guess Paper

Learn the HIGH-priority questions first, practise each diagram once by hand, and revise the definitions every day.

That order alone covers most of what the paper asks. Read each answer twice. Then close the file and write only the headed points from memory.

Numbers win marks in this paper. Examiners look for 4% of the world's fresh water serving 16% of its population, 1700 m³ for stress and 1000 m³ for scarcity. They also look for 135% irrigation intensity and 35-40% efficiency. Keep these on one sticky note and read it daily.

Finally, write the full form of every acronym at least once in each answer. Losing a mark because you wrote "WDT" without spelling it out is avoidable. The file flags each acronym for you.

8. Seven-Day Revision Plan

One unit-cluster a day for six days, then a full two-hour mock on day seven, is enough for a certificate-level paper.

Seven-day revision plan for ONR 001 Introduction to Water Harvesting using this guess paper
DayFocusMust-practise item
Day 1Water availability and demand (Q13, Q15)Per capita chart and the 2000 to 2050 sector table
Day 2Irrigation and pollution (Q16, Q17)Fresh water pie diagrams and the treatment flow chart
Day 3Rainwater harvesting and laws (Q10, Q12)State-wise limits for Delhi, MP, Tamil Nadu and Rajasthan
Day 4Dark areas, ITK and history (Q11, Q14)Five ITK structures with their regions
Day 5Watershed concept and programmes (Q6, Q7, Q9)Watershed diagram and the POWER table
Day 6Institutions, survey and PRA (Q1 to Q5, Q8)NRAA-to-WDT block diagram from memory
Day 7Short notes and mock (Q18, Q19)Any five questions in two hours, timed

9. How to Get the Full ONR 001 Guess Paper

Message 9899436384 on WhatsApp with "ONR 001", and you will receive the complete 21-page PDF on the same chat after payment.

The full file includes:

  • All 19 questions: the 5 you saw here plus 14 more, each with a complete answer.
  • Every diagram.
  • The three rule boxes.
  • The full 28-topic frequency grid.

You can also ask for help with a specific answer you are stuck on.

10. ONR 001 FAQs

What is included in the ONR 001 solved guess paper?

The file has 19 exam-style questions with full answers, spread over 21 pages and both blocks of the course. Each answer starts with the book definition, follows with headed points and ends with a short conclusion. You also get labelled diagrams, a what-not-to-prepare list, word targets per mark and a topic frequency grid covering six term-end papers from December 2023 to June 2026.

Which sessions were analysed for the guess paper?

Six term-end papers were analysed: December 2023, June 2024, December 2024, June 2025, December 2025 and June 2026. Every topic in the file is tagged by how often it appeared across these sessions. IGNOU holds ONR 001 exams only in June and December, so the grid follows that same calendar, and the file is aimed at the December 2026 term-end exam.

What is the exam pattern of ONR 001?

The paper runs for 2 hours and carries 50 marks. Eight questions are set and you attempt any five, each worth 10 marks. Most questions split into parts such as 5 + 5 or 2 + 3 + 5, and one question is usually short notes, where you pick four and write about 75 words each. Neat diagrams are expected wherever a question asks for them.

Which topics are most important for ONR 001?

Benchmark and natural resource survey appeared in five of the six papers analysed, and the roles of NRAA, SLNA, DWDU, PRIs, PIA and WDT also came five times. Water scarcity and stress, dark areas, water pollution, institutional arrangement and groundwater in irrigation each appeared four times. Start with these, then move to the medium-priority topics listed in the file.

How many answers can I see before ordering?

Five full answers are open on this page: institutional arrangement, watershed concept and components, dark area with ITK structures, water scarcity and stress, and water pollution with its treatment. Together they cover all four units, so you can judge the language, structure and diagrams. The remaining 14 questions and answers come in the complete file you receive on WhatsApp.

Is the guess paper written from the IGNOU study material?

Yes. Every answer is written only from the IGNOU study material for Block 1 (Basic Concepts) and Block 2 (Watershed Management), in simple English. Figures such as 1700 m³ for water stress, 135% irrigation intensity and the state rainwater harvesting rules come straight from the book, so what you write in the exam matches what examiners expect to read.

Can I write the ONR 001 exam in Hindi?

The question paper is bilingual, printed in English and Hindi, and you can answer in the medium you chose at admission. This guess paper is written in English. Hindi-medium learners can still use its structure, points, numbers and diagrams, since the definitions and facts stay the same in both mediums. Message us if you need help with a specific answer.

How do I get the full ONR 001 solved guess paper?

Send a WhatsApp message to 9899436384 with the course code ONR 001 and your programme, CWHM. Our team shares the price and payment details, and the complete 21-page PDF reaches you on the same chat after payment. If your study centre also needs a practical or project file for CWHM, ask about it in the same message.

11. Who Prepared the ONR 001 Answers

The ONR 001 answers were written by Prateek Talwar and reviewed by Sheetal Kirola at Unnati Educations.

builds each guess paper from the course blocks and recent term-end papers. Sheetal Kirola, Academic Head (M.Ed.), checks every definition, figure and scheme name against the IGNOU study material before release.

Ratings & Reviews

0.0
★ ★ ★ ★ ★
No reviews yet
Be the first to review this material.

Price

₹299.00 ₹399.00